TR    IT     ENG

Is there any power margin for setting up unlicensed electric production plant?

Unlicensed electric production plants can be set up maximum in 1MW power and can be codified maximum 1MW to the system.

There is a license application condition whose renewable sourced electric production is more than 1MW.

COPYRIGHT © 2013 GALATA RENOVA. ALL RIGHTS RESERVED.     |     PRIVACY POLICY     |     NEWS     |     FREQUENTLY ASKED QUESTIONS